What are the 15 key responsibilities of hvac site engineer? - hvac
The key responsibilities of HVAC site engineer
- Get approved HVAC Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Project Engineer.
- Ensure the HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by Inspection department prior to installation
- Ensure sufficient hand tools, power tools, ladder and scaffolding are available for installation
- Coordinate with other discipline and ensure site clearance is available to start the HVAC Activities
- Arrange the sufficient manpower such as Supervisor, Foreman, Duct fitter, pipe fitter, Assistant duct and pipe fitter etc.., and ensure all of them attended safety orientation and having proper PPE’s prior start installation activities at site
- Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor (or) Foreman and inform them to shift the required ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.
- Prior to start HVAC activities notify to QC Personal for surveillance to ensure the quality work
- To maintain safe all construction HVAC and Chilled water piping activities are carried out in accordance with the Company’s safety policies and procedures; ensure that appropriate safety and protective equipment is used by Company & Contractor staff.
- Closely monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specificationand get daily progress report from site supervisor (or) foreman and update to project Engineer (or) Manager
- Preparing relevant documents to conduct inspection for completed installation activities and raise RFI to QC-Inspector (To ensure that any activity offered for inspection has an attachment of IFC drawing, method statement (if required), Inspection & Test Plan (ITP) followed by check list)
- Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standard
- Preparing the relevant documents to Conduct Testing inspection such as Duct light testing for Ducts and Hydro test for Above ground and Underground chilled water piping’s, systems.
- Active involvement in weekly meetings with the Project management & QC Supervisor and manager to resolve the site related issues.
- Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s.
- Assist the Commissioning Team on Testing, Adjusting & Balancing (TAB) stages of the Air and Hydronic Piping’s.